12 July 2031
Operational rating and DEC
This building’s operational rating is B.
For more information on the building’s energy performance, see the DEC for this building.
Recommendations
Recommendation | Potential impact on carbon emissions |
---|---|
Engage experts to survey the condition of the heating systems and propose remedial works. | Medium |
Consider introducing or improving loft insulation. | Medium |
Consider upgrading major time controls to include optimum start/stop. | Medium |
Consider how building fabric air tightness could be improved, for example sealing, draught stripping and closing off unused ventilation openings, chimneys. | Medium |
Consider installing weather compensator controls on heating and cooling systems. | Medium |
Consider introducing a system of regular checks of Heating, Ventilation and Air Conditioning (HVAC) time and temperature settings and provisions to prevent unauthorised adjustment. | Medium |
Engage experts to review the HVAC control systems settings and propose alterations and/or upgrades and adjust to suit current occupancy patterns. | Medium |
Recommendation | Potential impact on carbon emissions |
---|---|
Consider applying reflective coating to windows and/or fit shading devices to reduce unwanted solar gain. | Medium |
Engage experts to propose specific measures to reduce hot water wastage and plan to carry this out. | Medium |
Consider engaging experts to review the condition of the building fabric and propose measures to improve energy performance. This might include building pressure tests for air tightness and thermography tests for insulation continuity. | Medium |
Recommendation | Potential impact on carbon emissions |
---|---|
Engage experts to review overall heating strategy and propose an investment programme for upgrading and/or switching to alternative solutions. | Medium |
Engage experts to review the building lighting strategies and propose alterations and/or upgrades to daylighting provisions, luminaires and their control systems and an implementation plan. | Medium |
Engage experts to review the HWS systems provisions and propose remedial works, upgrades and/or alternative provisions to improve effectiveness and efficiency and plan for implementation. | Medium |
Consider installing a ground source heat pump. | Medium |
Consider replacing or improving glazing. | Medium |
Recommendation | Potential impact on carbon emissions |
---|---|
Investergate the renewable Heat Incentive in relation to heat pumps | Medium |
Review levels of loft insulation and improve to 300mm | High |
Investegate external shading for solar reflective film for the shower facing window to the car park | Medium |
Building and report details
- Building occupier
- Building type
- Clinic
- Building environment
- Heating and Natural Ventilation
- Electricity used
- 9906 kW h
- Total useful floor area
- 212.88 square metres
- Building reference
- RRN-2608-1095-4593-0500-1125
- Report issued on
- 13 July 2021
- Calculation tool
- CLG, ORCalc, v4.0.4
- Type of inspection
- Physical
Assessor’s details
- Assessor’s name
- Chris proctor
- Employer’s name
- EasyEPC
- Employer’s address
- First floor office 12 Albion Street, BN2 9NE
- Assessor ID
- EES/010486
- Accreditation scheme
- Elmhurst Energy Systems Ltd